Safety Specialists for CSM-Ra & interoperability services

Who we are

At Railway Assurance, we ensure safe integration of railway projects, managing technical, operational, and organisational risks to existing infrastructure.

Our clients

Color gradient bar transitioning from blue to green to yellow.
Spencer British Engineering logo in blue and gray text
Tata logo, a blue circle with a stylized 'T' inside, and the word 'TATA' beneath it
Egis logo in green lowercase letters with a stylized 'e' icon
Logo for Linbrooke, Inc., featuring a globe icon and text 'Linbrooke, Inc.'
Logo of Network Rail with stylized orange and black lines resembling train tracks or pathways.
South Western Railway logo with black and blue text and arrow symbol.
The logo of the MMRA, featuring stylized black letters on a white background.
Logo of West Midlands Railway with black, gray, orange, and white design.
Galliford Try logo with a stylized red and gray flame above the company name in gray letters.
Logo with a blue circle containing a stylized letter 'N' and the word 'NORTHERN' in blue uppercase letters.
Logo with a blue square containing a stylized white and red arrow, followed by the text "Renaissance" in blue and "Home Mortgage" in red.
Midland Metro Alliance logo in pink with a train icon and text
Close-up of the Nexus logo in black on a white background.
siemens logo in teal on a white background
  • "Enjoyed a thorough, relaxed, informed session with a useful mix of attendees. "

    — Network Rail Architect

  • "Very useful session with good explanation of the purpose of the workshop. Strong guidance of the group ensuring discussions stayed relevant to the HAZID meeting. "

    —Project Manager, Spencers

  • "First HAZID i've attended, very useful and good to see such a big group kept on subject when needed."

    —WMT Track Engineer

  • "Very worthwhile exercise with all parties extremely focused and engaged. Good to see the end user come forward with current procedures and future suggestions/solutions considering existing constraints and operational requirements."

    — Project Manager

  • "Used Railway Assurance many times for a range of projects. Chris and team are always professional, thorough and always get us results. Best hazard record management i've seen in a long time. "

    —Anonymous CEM

  • "All day HAZIDS can seem long-winded for many companies but I was so impressed with Railway Assurance's structure of the day and attention to detail for our project. Breaks were at appropriate times and lunch provided! "

    — Anonymous DPE

  • "Not many people can manage HYBRID meetings yet Railway Assurance seem to have nailed it"

    — Anonymous RAM